Overhead Bridge Crane Pre-Shift Sling and Hoist Inspection
A comprehensive, highly-technical standard operating procedure for performing a pre-shift inspection on overhead bridge crane hoists, slings, and rigging components. Fully aligned with CSA B167 and ASME B30 standards.
Ensure the structural integrity and operational safety of the overhead bridge crane, hoist, slings, and rigging hardware prior to first use of the shift. The objective is to systematically identify any damage, wear, deformation, or malfunction that could directly lead to a dropped load, catastrophic rigging failure, equipment damage, or severe personnel injury. This procedure establishes a strict, repeatable baseline for defect recognition and mandatory lockout/tagout protocols.
This procedure applies strictly to all operators, millwrights, and maintenance personnel responsible for performing a pre-shift inspection on overhead bridge cranes (rated capacity 1 ton to 100 tons) within the facility. It encompasses a thorough examination of the hoist mechanism, wire rope, rigging slings (synthetic, wire, chain), hooks, load block, trolley assembly, bridge structure, runway rails, and all electrical/mechanical limit devices. This is a pre-operational inspection; it does not cover detailed preventative maintenance or load testing.
- Lockout/Tagout: Complete isolation of the main disconnect switch for the crane is mandatory before accessing any electrical panels, brakes, or drivetrain components. Verify zero energy state with a qualified electrician if required.
- Hard hat, safety glasses with side shields, high-visibility vest, steel-toed boots, and heavy-duty rigging gloves. Full-body harness with shock-absorbing lanyard is required when working from elevated platforms or on the crane bridge.
- Barricade: Establish a clearly marked caution zone or barricade on the floor directly beneath the crane inspection area. Absolutely no personnel shall pass under a suspended load or a moving crane during the inspection cycle.
- Tag Out: Immediately tag the crane "OUT OF SERVICE — DO NOT OPERATE" at both the floor level and the pendant if any critical defect is found. Notify the shift supervisor and submit a formal work order before the crane is used.
- Inspection checklist / clipboard (OEM or facility-standard)
- High-lumen rechargeable flashlight (minimum 1000 lumens)
- Calibrated tape measure (metric/imperial) for sling length and hook throat stretch
- Wire rope caliper (pin-type or digital, for diameter reduction check)
- Torque wrench (for verifying bolted connections on rail splices and end stops)
- Digital camera or tablet for photo documentation of defects
- Lockout/tagout kit (personal padlocks, group hasps, "DANGER" tags)
- Cleaning rags and industrial solvent (for removing grease/debris from inspection points)
- OEM-specified lubricant for hoist chain or wire rope (if required post-inspection)