Edgebander Glue Spreading Roller Replacement
Safe, repeatable procedure for replacing the glue spreading roller and doctor blade assembly on HOMAG, SCM, and Biesse hot-melt edgebanders. Restores uniform glue application and prevents edge band delamination.
To establish a safe, repeatable procedure for replacing the glue spreading roller and adjusting the doctor blade gap. This prevents glue line defects, reduces downtime, and extends the life of the glue applicator assembly.
This procedure applies to all industrial edgebanders equipped with a motorised glue roller and doctor blade assembly (common on HOMAG KAL series, SCM Pratika, Biesse Akron). Only qualified maintenance technicians with electrical/mechanical lockout training should perform this task.
- Lock and tag out main electrical disconnect. Verify zero energy with a voltage tester at motor terminals before beginning work.
- Wear nitrile gloves (glue contact), safety glasses, and heat-resistant gloves if the tank is still warm. Use adhesive solvent in a ventilated area.
- Glue roller and tank may retain residual heat up to 180°C. Allow a minimum 30-minute cool-down period after power-off before handling any part of the glue pot.
- Support the roller shaft when removing retaining bearings. The roller assembly weighs approximately 8 kg. Use a second technician for lifting if necessary.
- When using adhesive solvent (e.g., EVA cleaner), work in a well-ventilated area and avoid prolonged skin contact. Follow manufacturer’s SDS.
- New glue spreading roller (OEM matched to machine)
- Doctor blade (if worn or damaged)
- Set of hex keys (metric: 4, 5, 6, 8 mm)
- Torque wrench (10–25 Nm)
- Soft-faced mallet
- Brass drift punch
- 2-jaw puller (for sprocket removal)
- Temperature-resistant lubricant (e.g., Molykote 111)
- Adhesive solvent and clean rags
- Feeler gauge set
- Dial indicator with magnetic base
- Voltage tester
- Lockout/tagout kit