Standard Work & 5S · Audit & Matrix Form

5S Lean Manufacturing Gemba Walk Master Audit Template

A comprehensive 5S audit template designed for Gemba walks. Evaluate work areas against the five pillars of visual workplace organization, assign scores, and drive kaizen based on real-time observations.

Frequency
Daily / Weekly
Department
Production / Shop Floor
Methodology
5S / Lean / Gemba
Version
2.1
Free download — no sign‑up, no email.Take this audit or matrix to your shop floor and deploy it on a clipboard.
Overview & Purpose

This master audit template standardizes the 5S evaluation process across all production areas. By conducting regular Gemba walks using this matrix, plant leadership can objectively score Sort (1S), Set in Order (2S), Shine (3S), Standardize (4S), and Sustain (5S) activities. The scoring system (1-5) highlights areas of strength and exposes gaps for immediate countermeasure deployment. Consistent use of this template builds a culture of visual discipline and continuous improvement.

Prerequisites & Context
  • REQAll area team members have completed foundational 5S training (Sort, Set, Shine) and understand the plant's visual management standards.
  • REQCurrent area layout map (paper or digital) showing designated locations for all equipment, tools, and materials.
  • INFOAudit is conducted jointly with the area team lead or cell owner to ensure accurate context and immediate feedback loops.
  • INFOPrevious audit scores and corrective action log should be available for review to track trend performance.

Audit / Evaluation Matrix

5S Pillar Criteria / Metric Evaluation Question / Standard Score (1-5) Notes / Observations
1S · Sort (Seiri) Red Tag / Hold Area Management Does a designated red tag area exist? Are items in the area clearly tagged with date, origin, and justification? Are unneeded items removed from the active workspace? [ ] _________________________
1S · Sort (Seiri) Essential Items Only Are only the necessary tools, dies, fixtures, and materials present for the current production schedule? Are obsolete drawings or expired materials purged? [ ] _________________________
2S · Set in Order (Seiton) Tool & Equipment Storage Does every tool have a designated, clearly labeled home (shadow board, drawer insert, rack)? Are tools returned after use? Are walkways and material staging areas clearly marked? [ ] _________________________
2S · Set in Order (Seiton) Visual Labels & Signage Are all location labels, floor markings, and directional signs legible and correctly applied? Do location labels match the standardized naming convention? [ ] _________________________
3S · Shine (Seiso) Daily Cleaning Schedule Is a cleaning schedule clearly posted and adhered to? Are machines, floors, and work surfaces free of debris, oil, and dust? Are cleaning supplies readily accessible? [ ] _________________________
3S · Shine (Seiso) Contamination Control Are sources of contamination (leaks, dust, chips) identified and are countermeasures in place? Are inspection points clean and easy to access? [ ] _________________________
4S · Standardize (Seiketsu) Visual Standards Posted Are the 5S standards for this specific area posted (e.g., photos of the ideal condition, responsibility matrix)? Is there a standard method for cleaning and organizing? [ ] _________________________
4S · Standardize (Seiketsu) Role Clarity & Accountability Is the 5S responsibility matrix current? Does every team member understand their specific duties for maintaining organization and cleanliness? [ ] _________________________
5S · Sustain (Shitsuke) Audit & Score Transparency Are 5S audit scores prominently displayed on the area communication board? Are scores trending positive over the last 4-6 weeks? Are there documented corrective actions for low-scoring items? [ ] _________________________
5S · Sustain (Shitsuke) Training & Discipline Are all employees current on their 5S training? Is there a process for onboarding new hires and re-training when standards are not met? Are Gemba walks conducted with respect and focus on process, not blame? [ ] _________________________

Standardize Your Shop Floor

Your processes are only as good as your ability to sustain them. ShopDocs gives you a centralized, digital library for all your SOPs, 5S audits, and training materials. Keep your team accountable and your shop lean.

Try ShopDocs →

Action Items & Follow-Up Plan

Date Gap Identified Countermeasure / Action Owner Target Date
2025-05-21 Red tag area not utilized; holds obsolete tooling with no review date. Re-train team on red tag criteria and schedule monthly review meeting with area lead. Area Lead 2025-05-30
___/___/_____ _______________________________ _______________________________ _______ ___/___/_____
___/___/_____ _______________________________ _______________________________ _______ ___/___/_____
___/___/_____ _______________________________ _______________________________ _______ ___/___/_____
___/___/_____ _______________________________ _______________________________ _______ ___/___/_____
Sign-Off & Verification

By signing below, the auditor, lean champion, or area supervisor verifies that all assessments have been completed accurately and improvement plans are communicated.

Auditor / Supervisor Signature
Date & Time

Software that works like your best tools.

This SOP library is maintained by Ryxen — focused software tools that solve specific operational friction points for Canadian small businesses. No ERP bloat, no per-user pricing, no demo calls.

SwitchDesk · Call Tracking SiteQueue · Install Tracking ServiceGrid · CMMS SupplyGrid · Material Orders SafeDesk · Safety Compliance ShopDocs · Visual SOPs